Pipe and film extrusion lines are among the most continuous, hardest-working machines in any plastics plant — often running 24 hours a day, 6 days a week. Every uninsulated heater watt is a watt paid for and then lost to the shed roof. IHEAT's IWRAP insulation jacket wraps the entire pipe/film extrusion barrel, die head, adapter and screen changer, delivering 25–35% heater electricity savings and 3–4 month payback on typical Indian lines.

Unlike batch machines, pipe and film extrusion lines rarely stop. A HDPE pipe line runs 22–24 hours a day, 300+ days a year. That means every kilowatt of radiant heat loss from an uninsulated barrel or die head is multiplied by ~7,500 operating hours annually. The economic case for insulation on continuous extrusion is stronger than any other machine category.
Real numbers from a 90mm HDPE pipe line in Ahmedabad: pre-insulation heater consumption was 27.4 kWh/hr; post-IWRAP it dropped to 19.1 kWh/hr — a 30% reduction. Annual saving at ₹8.5/kWh × 7,500 hrs = ₹5.28 lakh per line.
We manufacture jackets for every heated element on a pipe extrusion line: the barrel (multiple heater zones), gearbox oil-tank cover (optional), adapter, screen changer, die head, and the die-face flange. All pieces are custom-sized to your machine — no generic wrappers, no waste.
For PVC pipe lines, we use a thicker jacket variant to handle the process-temperature range (170–210°C) while keeping external touch temperature under 45°C. For HDPE and PPR lines (200–260°C), the standard IWRAP jacket handles all zones comfortably.
Blown-film and sheet-die extruders benefit from IWRAP in two ways: (1) direct electricity savings on the barrel and die head, and (2) improved gauge control because the die head holds temperature within ±1°C. Film thickness variation on a well-insulated line often drops from ±4% to ±2% — a major quality improvement that reduces returns and complaints from converters.
We manufacture die-head jackets to fit annular film dies, T-slot sheet dies and coat-hanger sheet dies. All jackets include cut-outs for heater band terminals, pressure transducers and melt-temperature probes.
Because pipe and film lines run more hours than any other plastic machine, IWRAP pays back faster here than anywhere else — often in under 3 months for HDPE pipe, and as fast as 2 months on 24/7 blown-film lines. Every year after payback the savings compound: a single line typically saves ₹4–6 lakh/year, and one plant we work with saves over ₹40 lakh/year across their 8-line pipe extrusion facility.
Yes. IWRAP holds die-head temperature within ±1°C, which stabilises melt viscosity and dramatically improves gauge control. Film thickness variation often drops from ±4% to ±2%, and pipe wall thickness deviation reduces by 30–40%.
Yes. All IWRAP jackets are designed for continuous operation and rated to 550°C — well above pipe/film extrusion process temperatures. Warranty is 24 months regardless of operating hours.
Typically 60–100 days for a 90mm HDPE pipe line running 22 hrs/day at ₹8.5/kWh. Higher-tonnage lines and 24/7 operation see faster payback. Use iheat.in/roi-calculator for a line-specific estimate.
Yes. IWRAP is rated to 550°C continuous. PVC process temperatures are 170–210°C — well within the jacket's operating range. We use a heavier-duty variant for PVC to maintain touch-temperature under 45°C.
Send us your barrel dimensions and heater load — our engineers respond with a custom IWRAP quotation within 24 hours.